NameIssueLocationSubmitted DateNotesStatus
Amelia Mayer

Shower room women's side clog

Change roomsJune 4, 2024

Fixed by plumber on June 5 -AM

Arrived morning of June 4 to a note from rowers saying women's shower clogged and lots of water in the change room/washroomside. Amelia called plumber June 4 morning and they will be coming June 5 morning -AM Going to do both women's and men's side.

Completed
Amelia Mayer

Shower room lights need to be replaced

WashroomsJune 3, 2024

Shower room lights need to be replaced
Amelia called Julian June 3 2024, waiting on reply -AM
Julian can come on either June 11 or June 12 -AM

In progress
Kai

Boat

BoatMay 16, 2024

Coach boat #6, will not start.

Submitted
Alex birkenshae

Coach boat #3#3, #5, #6

BoatMay 15, 2024

Coach boat 3 has a line that is fully unclipped from the motor

5 has a leak in the gas line

6 has a leak in the gas line

Both sounded/felt like it was just pumping air and would not start

Submitted
Amelia Mayer

Dock

Exterior (general)May 15, 2024

Mike P flagged to Amelia on May 15:
Metal aluminum cracking on one of the bars for the ramp that goes from north dock to south dock door near washroom. Welder needed? Not urgent, it is not load bearing

In progress
Amelia Mayer

Dock

Exterior (general)May 15, 2024

Amelia spoke to Mike Pearce on May 15
He flagged we should get IMF to come look at the dock connectors to make sure they are okay, haven't had this done in a few years

In progress
Clark

Coach Boat #3

BoatMay 15, 2024

Does in fact still not start

Submitted
Amelia Mayer

Dock

OtherMay 10, 2024

Friday May 10 2024 around 3:30pm I realized we were very low with the tide. I went down to measure the South Float Dock level, near the south ramp (the closest part to the shore) and there was only 1 foot between the bottom of the float to the bottom of the river.

Nothing urgent to do now, but Amelia emailed James some photos, may want to look into this as a larger project to make sure we would never be in a situation where the float meets river bottom and damages the dock.

In progress
Amelia Mayer

Front door and side stair door latch

Exterior (general)May 9, 2024

-Both front door and side galley doors, latches are catching again (just had this fixed 6 months ago).

-Amelia to call Pacific Coast Doors to look at this and do annual check of all doors end of May

Amelia called Pacific Coast Doors and they came out on May 16 2024 to fix DONE -AM

Completed
Amelia Mayer

Full Facility

OtherMay 9, 2024

-Install yellow strips on stairs (back patio & side stairs)
-Install 2 lockable covers around thermostats
-Install 2 patio door sliding door closers (so they automatically shut if opened to help heating system.

Update: Amelia organized Hubby For Hire to do the above items on May 15 2024
Update May 15: didn't have enough of the yellow strip! Most of side stairs done, ordered more from Uline coming in a week -AM

In progress
Amelia Mayer

UBC Boathouse Road Sign

Exterior (general)May 8, 2024

The 'O' fell out. Amelia has on her desk. Need to find a way to put it back in because the quote from the sign company was over $2000 (crazy!)

Update: Handy man on May 15 fixed! Done - Amelia

Completed
Amelia Mayer

Full Facility

OtherMay 8, 2024

Replacement Main Fire Panel in front office
Work with Chubb & Vancouver Fire
Need to find new location in front office because it is a different size than previously, dry wall work will need to happen

In progress
Amelia Mayer

Stairways; Side stairs and back patio stairs

Exterior (general)May 8, 2024

Replace all yellow strips on both stairwells
Already have the supplies, just need it installed!

Completed
Amelia Mayer

Everywhere Facility

OtherMay 8, 2024

-2 hinges on women's washroom side cabinets
-Toilet paper dispenser installing women's side washroom
-Lock on stall women's side washroom
-3 door stops: Kitchen, storage and athlete's lounge
-Hinge cabinet fix in kitchen

Amelia organized J.P. Handy Man Richmond to do this on May 17 2024
Completed May 17 2024 - DONE -AM

Completed
Jess

Coach boat #5

BoatMay 1, 2024

Not starting

Requested servicing by Galleon- VA 5/1/24.
Galleon serviced motor-VA 5/13/24.

Completed
Clark

Coach boat 3

Boat BayMay 1, 2024

Potential engine issues cut out yesterday

New lock on and new key on ring-please further respond if still not running issue-VA 5/1/24.

In progress
Clark

Coach boat 7

Boat BayMay 1, 2024

Key for 7 is snapped in lock

New lock on, and new key on ring-VA 5/1/24.

Completed
Clark

Coach boat 8

Boat BayMay 1, 2024

Engine won't start

Requested servicing from Galleon- VA 5/1/24.
Galleon looked at it, significant issues with crank case, potentially may be at end of life. VA-5/13/24.

In progress
Clark Schultz

Coach Boat #1

BoatMarch 30, 2024

Puncture in fuel line

4/10/24-Followed up with Galleon for servicing request-VA.

Completed
Amelia Mayer

Roof drain clogged

Exterior (general)July 6, 2023

2 drains on roof (on on south float one on north float) are clogged and our plumbers can't figure out where the clog is - likely below where it leads into the river.

Andy reached out to try and get drawings for the float, however we cannot find these in UBC records.

Someone come out that can drill through?

In progress